Existing tiles remain
No full tear-off in suitable properties, helping keep the interior protected during work.
A double-layer metal roof KL Malaysia property owners can install above existing tiles—reducing demolition, mess and exposure while adding a durable PPGI outer shield.
The IBS double-layer system uses an engineered steel support frame installed above the existing tiled roof. A new PPGI metal deck forms the outer weather layer while the tiles remain as an additional barrier below.
IBS works across residential and commercial properties throughout Kuala Lumpur, Selangor and Klang Valley. Recommendations are based on the building condition, access, exposure and long-term value—not a one-size-fits-all package.
Before pricing, our specialist confirms the property type, safe access, existing construction, affected area and any limits on working hours. This allows labour, equipment, protection and disposal requirements to be included from the start. Where more than one approach is practical, we explain the difference in disruption, expected service life and maintenance so you can compare value clearly.
Materials are selected for the actual substrate and may include professional systems from recognised industry manufacturers.
Our team checks the connected details around the visible problem so the proposed work addresses the cause and not only the symptom.
No full tear-off in suitable properties, helping keep the interior protected during work.
A measured support structure creates the correct falls, clearance and fixing points.
Durable metal roofing provides a low-maintenance shield against sun and driven rain.
Every IBS project begins with the condition on site. The scope, materials, timing and warranty are made clear before work starts.
WhatsApp photos, the property location and a short description so our team can prepare for the visit.
We inspect the roof or building element, trace the likely cause and document the relevant condition.
You receive a practical scope with selected materials, expected timing and applicable warranty.
The completed work is checked, the area is cleaned and the warranty information is confirmed.
Real project photography from the IBS portfolio. The team works on homes, factories and shop lots with the same inspection-first approach and transparent scope.
View all 12 projectsDetails vary by building, but these are the questions property owners ask most often before an inspection.
In suitable properties, no. The steel support frame and new PPGI deck are installed above the existing tile roof.
Usually, yes. Because the existing tiles remain in place, the interior is not deliberately exposed as it would be during a complete tear-off.
The additional layer and separation can reduce direct solar loading compared with an exposed single roof surface. Final comfort also depends on insulation and ventilation.
One team for roof repair, new protection systems, waterproofing, structural work and selected renovation requirements.